2014 Bike/Ped Projects

TIP IDProject NameProject Description Sponsoring Agency
Managing AgencyProject LocationDesign PhaseDesign CostROW PhaseROW CostConstruction PhaseConstruction Cost
 Middle Creek GreenwayThe project involves construction of a ten-foot wide greenway from Sunset Lake Rd (SR 1301) to east of Straywhite Ave in the Miramonte subdivision. The project length totals approximately 5,700 feet of concrete, asphalt, and boardwalk path. The project may include some areas where public easements must be obtained from private property owners. Apex Same as Sponsoring AgencyApex$308,000.00$50,000.00$830,000.00
 Peace Street East StreetscapeThis project will complete the preliminary engineering and design of major streetscape improvements along Peace Street from West Street to Person Street (.6 miles). The design will include engineering of sidewalk improvements and repairs, driveway consolidations, street trees, traffic signal upgrades, and relocation of overhead utility lines underground. Upon the completion of the preliminary engineering and design, the project will be programmed for construction and will provide over .9 miles of continuous streetscape improvements. Raleigh Same as Sponsoring AgencyRaleigh$550,000.00$650,000.00$2,500,000.00
 Old Raleigh EastCompletion of sidewalk gap totaling approximately 500 linear feet to complete a contiguous sidewalk along the south side of Old Raleigh Road (SR 1435) from Lake Pine Dr to Town of Cary corporate limits. Project includes clearing and grubbing, grading, retaining wall, and 5-foot concrete sidewalk. Apex Same as Sponsoring AgencyApex$17,500.00$5,000.00$170,000.00
 Tingen Rd SidewalkCompletion of sidewalk gaps totaling approximately 950 linear feet to complete a contiguous sidewalk along the west side of Tingen Road (SR 1153) from Apex Elementary School to Apex Pewy. Project includes clearing and grubbing, grading, concrete driveway aprons, and 5-foot concrete sidewalk. Apex Same as Sponsoring AgencyApex$10,000.00$15,000.00$75,000.00
 Peace Street West StreetscapeThis project will complete construction of the Peace Street West Streetscape Plan from St. Mary’s Street to West Street (.3 miles). The improvements include the installation of 10-foot concrete sidewalks, street trees, street furniture, lighting, traffic signal upgrades, signage, relocation of overhead utility lines underground, and storm drainage system enhancements. Raleigh Same as Sponsoring AgencyRaleigh$0.00$0.00$1,350,000.00
 Church Street SidewalkConstruction of approximately 2,000 linear feet of sidewalk along the west side of Church Street from Morrisville-Carpenter Road to Jeremiah Street. The project includes construction of a five foot wide sidewalk with a mid-block pedestrian crossing to the Historic Christian Church located on the east side of Church Street. Morrisville Same as Sponsoring AgencyMorrisville$0.00$0.00$157,000.00
 Creedmoor to Butner GreenwayThis project involves the design phase of a ten-foot wide greenway from Lake Roger’s Park in Creedmoor to Pond Drive in Butner along NC 56. The project also includes sidewalk and bicycle accommodations on Pond Drive in Butner. The total project length is 6,800 feet of concrete and asphalt path and includes a bridge section over Ledge Creek at Lake Roger’s Park. This is the final section of the greenway that will fill in the gap and connect Butner to Creedmoor and will result in over 5 miles of continuous greenway in southern Granville County. Granville County Same as Sponsoring AgencyGranville County$190,000.00$150,000.00$980,000.00
 Park-Depot Greenway TrailPlanning/design/NEPA, and right-of-way acquisition of 1,870 linear feet of paved or boardwalk greenway trail from the existing Park-Depot Greenway Trail in the Town’s Old Honeycutt Park to the existing and under construction Park-Depot Greenway Trail in South Lakes Subdivision located on the east side of NC Highway 55 South. Fuquay-Varina Same as Sponsoring AgencyFuquay-Varina$106,250.00$63,000.00$543,750.00
 Downtown Raleigh Pedestrian Safety ImprovementsThis project involves the construction of pedestrian intersection improvements including installation of count down pedestrian signal heads with pedestrian push button posts, and/or curb ramp improvements. These improvements will be installed at 20 intersections throughout downtown Raleigh that are currently without pedestrian signal heads. The specific intersection locations are…• N. Blount Street/E. Lane Street • N. Blount Street/E. Peace Street • Peace Street/Person Street • Peace Street/West Street • E. Cabarrus Street/S. Bloodworth Street • W. Cabarrus Street/ Person Street • S. Dawson Street/W. Davie Street • E. Edenton Street/N. Bloodworth Street • W. Edenton Street/N. West Street • E. Edenton Street/ N. East Street • W. Hargett Street/N. Boylan Avenue • Hillsborough Street/West Street • New Bern Avenue/Bloodworth Street •New Bern Avenue/East Street • N. Person Street/E. Lane Street • Morgan Street/Glenwood Avenue • Hillsborough Street/Salisbury Street • Lane Street/McDowell Street • Jones Street/Person Street • Dawson Street/Lane Street Raleigh Same as Sponsoring AgencyRaleigh$0.00$0.00$210,000.00
 CCC Ped ConnectorConstruction of two specific improvements which facilitate the connection of the Clayton Community Center with several schools and downtown Clayton. The first improvement is a 1.2 mile multi-use pedestrian connector (10-foot wide trail designed to AASHTO, NCDOT, and Town standards) that ties into the existing five foot sidewalk at the Clayton Community Center (located at the intersection of Shotwell Road and Amelia Church Road), parallels Amelia Church Road, turns to the south and follows Little Creek, crosses Little Creek with a pedestrian bridge, and then follows an existing Town of Clayton sanitary sewer easement to Lombard Street. At Lombard Street, the 10-foot wide trail ends and continues as a five foot sidewalk along Lombard Street, continues underneath US 70, and terminates at the intersection of Lombard Street and Hamby Street. The second improvement is an upgraded pedestrian crossing of the North Carolina Rail Road (NCRR) at its intersection with Church Street (between East First Street and Front Street). Clayton Same as Sponsoring AgencyClayton$130,000.00$15,000.00$1,038,463.00