TIP IDProject NameProject Description Sponsoring Agency
Managing AgencyProject LocationDesign PhaseDesign CostROW PhaseROW CostConstruction PhaseConstruction Cost
 RTP/Morrisville Davis Drive TrailConstruction of a 10-ft wide paved multiuse trail along Davis Drive, from Parkside Valley Drive in Morrisville to Kit Creek Road in Research Triangle Park (approx. 5600 lf of new trail). This project will tie into existing trail along Davis Drive at either end, as well as trails along Kit Creek Road, Little Drive, and bike lanes along Parkside Valley Drive. An underpass structure for the NC 540 crossing is included in the project. Approximately 450 lf of trail falls within the Town of Morrisville. RTP will be partnering with the Town on construction of this segment, and the Town will provide maintenance for this segment after project completion. RTP Same as Sponsoring AgencyRTP$0.00$0.00$1,650,000.00
 Panther Creek Greenway & TrailheadThis project involves construction of an approximate 25-30 vehicle trailhead and 1.4 miles of 10’ wide asphalt trail linking a middle school, an elementary school, a town park, and a commercial activity center to residents on either side of a major thoroughfare and Interstate 540, including many high density residential developments. Construction includes an approximate 90’ bridge across Panther Creek and connections to adjacent neighborhoods. This section of Panther Creek Greenway will provide links to an existing short and currently disconnected, grade-separated crossing of I-540; and will also provide connection to an existing grade-separated pedestrian facility at Green Level Church Road, creating safer bicycle and pedestrian access to the schools, park and commercial center. Cary Same as Sponsoring AgencyCary$220,850.00$0.00$2,286,000.00
 N Main St / US 401 Pedestrian ImprovementsThis project will consist of preliminary engineering and design, right of way acquisition, utility relocation, and the construction of 0.75 miles of sidewalk along approximately 1 mile of the North Main Street corridor. The sidewalk will fill in existing gaps, utilize the existing Norfolk Southern railroad bridge over US 401 to provide a safe pedestrian crossing along the existing US 401 corridor. The project will continue along North Main crossing at Mill Creek Road to connect to the existing sidewalk associated with the Marquee Station Mixed Use / Apartments Development. Ultimately, the sidewalk connects to the existing sidewalk across from the Fuquay Elementary School on Johnson Pond Road. A crosswalk will be installed to provide a safe crossing for elementary kids. Fuquay-Varina Same as Sponsoring AgencyFuquay-Varina$125,000.00$150,000.00$800,000.00
 Beaver Creek Greenway Phase IIThe proposed project will construct a ten-foot-wide public greenway along existing easements between Kelly Road and Apex Barbecue Road and a 10-foot-wide multi-use path along the east side of Kelly Road from the greenway to the western terminus of the existing Beaver Creek Greenway in Kelly Road Park. The greenway will consist of asphalt, concrete, and boardwalk sections as needed. The multi-use path will be asphalt and/or concrete as needed. The project is Phase 2 of the Town of Apex Beaver Creek Greenway. Phase 1 of the greenway has been constructed between Jaycee Park (on NC 55) and Kelly Road Park (on Kelly Road). Phase 2 of the project (proposed) will extend the greenway from its current terminus at Kelly Road Park to the Apex Nature Park on Apex Barbecue Road. A portion of the greenway is currently under construction within the Apex Nature Park. Future phases of the project will extend the greenway to the west to connect to the American Tobacco Trail and to the east to connect to Downtown Apex. The project includes approximately 4200 feet of public greenway along existing easements between Kelly Road and Apex Barbecue Road and 500 feet of multi-use path along the east side of Kelly Road near Kelly Road Park. Project termini will be Apex Nature Park to the west and Kelly Road Park to the east. Apex Same as Sponsoring AgencyApex$100,000.00$30,000.00$420,000.00
 Apex Barbecue SidewalkThe proposed project will construct a five-foot-wide concrete sidewalk along the north side of Apex Barbecue Road from Evans Road to South Salem Street and along the south side of Apex Barbecue Road from Evans Road to Olive Chapel Road to provide a complete connection between downtown Apex (and surrounding neighborhoods) and the new growth areas of town (including the Apex Nature Park). The project will also include a crosswalk at Kelly Road. Apex Same as Sponsoring AgencyApex$150,000.00$75,000.00$725,000.00
 James - Schieffelin SidewalkThe proposed project will construct a five-foot-wide concrete sidewalk along the south side of James Street from the existing terminus approximately 150 feet west of NC 55 to Schieffelin Road and along the east side of Schieffelin Road from James Street to Ten Ten Road to complete sidewalk gaps around downtown Apex. Apex Same as Sponsoring AgencyApex$75,000.00$50,000.00$250,000.00
 New Bern Avenue Pedestrian ImprovmentsConstruct combination of sidewalks (Tarboro St to Raleigh Blvd) and multiuse paths (Raleigh Blvd to Sunnybrook Rd), including improved transit shelters/stops Raleigh Same as Sponsoring AgencyRaleigh$500,000.00$1,320,000.00$3,931,711.00
 Trailwood SidewalkConstruct sidewalks to fill missing sidewalk gaps between Thistledown Dr./Main Campus Dr. and Canine Tech Way/Lineberry Dr. and across I-40 Raleigh Same as Sponsoring AgencyRaleigh$130,000.00$0.00$744,000.00
 NC 210 S. sidewalk connectionWith this LAPP grant, the Town of Angier would like to add to an existing sidewalk network. This would be a 2 phased project. Phase 1 would consist of design and engineering for a 5' sidewalk, including storm drainage and curb & gutter. Then, hopefully next year's funding cycle would involve a grant application for Phase 2 of the project, which would be for construction. This project would introduce a new and valuable segment of sidewalk from S. Raleigh St (Hwy 55) 1,830' along NC 210 S. Angier Same as Sponsoring AgencyAngier$100,000.00$0.00$0.00
 Smith Creek GreenwayTo secure property/easements and complete construction for a 2.7 mile segment of Smith Creek Greenway from Burlington Mills Road to the Smith & Sanford Creek Greenway junction (TIP# C-5164). Wake Forest Same as Sponsoring AgencyWake Forest$0.00$300,000.00$4,427,300.00