2017 Bike/Ped Projects

TIP IDProject NameProject Description Sponsoring Agency
Managing AgencyProject LocationDesign PhaseDesign CostROW PhaseROW CostConstruction PhaseConstruction Cost
 White Oak Greenway - MacArthur SectionProject consists of construction of a 2200 linear foot gap in the White Oak Creek Greenway between MacArthur Drive and Davis Drive which will include a grade-separated rail crossing, and boardwalk for a majority of the length of the trail, as well as pedestrian signal and crossing improvements at the Davis Drive at-grade crossing. Cary Same as Sponsoring AgencyCary$0.00$0.00$4,550,000.00
 Black Creek Greenway - Phase VProject will complete design and ROW for a 1,300 linear foot gap in the Black Creek Greenway, requiring multiple pedestrian bridges and a large retaining wall from the existing Black Creek Greenway to West Dynasty Drive. Cary Same as Sponsoring AgencyCary$150,000.00$365,000.00$1,000,000.00
U-5530 GAPark - Depot Greenway TrailRight-of-way acquisition and construction of 1,870 linear feet of paved or boardwalk greenway trail from the existing Park-Depot Greenway Trail in the Town’s Old Honeycutt Park to the existing Park-Depot Greenway Trail in South Lakes Subdivision located on the east side of NC Highway 55 South. Fuquay-Varina Same as Sponsoring AgencyFuquay-Varina$106,250.00$42,000.00$987,725.00
 Apex Barbecue Rd SidewalkThe proposed project will construct a five-foot-wide concrete sidewalk along the north side of Apex Barbecue Road from Evans Road to South Salem Street and along the south side of Apex Barbecue Road from Evans Road to Olive Chapel Road to provide a complete connection between downtown Apex (and surrounding neighborhoods) and the new growth areas of town (including the Apex Nature Park). The project will also include a crosswalk at Kelly Road. If sidewalk along South Salem Street from Apex Barbecue Rd (eastern terminus of this project) to Grappenhall Drive has not been constructed prior to this project being designed, the project will include a five-foot-wide concrete sidewalk along the west side of South Salem Street to connect the Apex Barbecue Road sidewalk with the Whitehall neighborhood and the rest of the sidewalk network in Apex. Apex Same as Sponsoring AgencyApex$70,000.00$106,000.00$800,000.00
 James/Schieffelin SidewalkThe proposed project will construct a five-foot-wide concrete sidewalk along the south side of James Street from the existing terminus approximately 150 feet west of NC 55 to Schieffelin Road and along the east side of Schieffelin Road from James Street to Ten Ten Road to complete sidewalk gaps around downtown Apex. Apex Same as Sponsoring AgencyApex$53,000.00$50,000.00$418,000.00
 Fuquay Downtown Dog Park Greenway Trail and Sidewalk ImprovementsProject consist of Planning/Design/NEPA, Right-of-Way Acquisition and Construction of 1,105 linear feet of greenway trail from the Town’s Mineral Springs Park to the Town’s Downtown Dog Park and 1,120 linear of pedestrian sidewalk along Depot Street from the Town’s Downtown Dog Park to the existing sidewalk/ streetscape improvements at the intersection of Depot Street and Spring St that is located at the western edge of the Fuquay Central Business District. Fuquay-Varina Same as Sponsoring AgencyFuquay-Varina$52,476.00$20,000.00$364,856.00
 Johnson Pond Rd Sidewalk ImprovementsProject includes 2109 feet of new sidewalk along existing Johnson Pond Road and associated handicap ramps. Also includes new crosswalk and pedestrian safety devices necessary to allow safe passage from the Sterling Ridge Subdivision and the Marquee Station mixed use development. Also connects to the existing Fuquay-Varina American Legion Post 116 site, Carillon Assisted Living, and the Johnson Pond LDS Church. Fuquay-Varina Same as Sponsoring AgencyFuquay-Varina$65,810.00$100,000.00$338,239.00
 Main Street ImprovementsThis project consists of a set of bicycle and pedestrian streetscape improvements to Main Street that originated in the 2014 Northeast Area Study (NEAS). Construct sidewalks, curb extensions, cross-walks, and implement shared lane markings along with other streetscape improvements along 0.23 miles. Youngsville Same as Sponsoring AgencyYoungsville$82,500.00$0.00$550,000.00
 NC 210 S. Sidewalk ConnectionsWith this LAPP grant, the Town of Angier would like to add to an existing sidewalk network in order to provide walkable connectivity in a low income area of town. This project will consist of design, engineering and construction for two 5' wide sidewalk sections which include storm drainage and curb & gutter. The new sidewalk would provide a valuable link in the chain of our current walkable network and extend from S. Raleigh St (Hwy 55) 1,830' along NC 210 S. Also, another 350' connection is requested along S. Park St to connect the almost complete sidewalk on Lillington St to this new section along Hwy 210. The estimates, which are based on an evaluation of our most recent bid, include an additional 15-inch RCP, yard inlets, potential utility pole relocations, and water/sewer service relocations. Angier Same as Sponsoring AgencyAngier$77,000.00$0.00$445,850.00
 Crabtree Creek West GreenwayThe City has constructed a greenway trail along the Crabtree Creek Greenway Corridor that extends from the Neuse River to Lindsay Drive in west Raleigh. Crabtree Creek West is the remaining trail section of this greenway corridor and will extend from the existing terminus at Lindsay Drive to the eastern boundary of Umstead State Park on Ebenezer Church Road. This proposed trail section is approximately 2 miles in length. This segment is a critical link in a regional greenway system. http://www.raleighnc.gov/parks/content/ParksRec/Articles/Projects/CrabtreeCreekWest.html Raleigh Same as Sponsoring AgencyRaleigh$460,000.00$100,000.00$4,550,000.00