2019 Bike/Ped Projects

TIP IDProject NameProject Description Sponsoring Agency
Managing AgencyProject LocationDesign PhaseDesign CostROW PhaseROW CostConstruction PhaseConstruction Cost
 Dunn Creek Greenway Phase 3Dunn Creek Greenway, phase 3 will provide 1.73 miles of ten foot wide paved greenway that will connect to multiple sidewalks, a multi-use path, an existing park, a new trailhead with parking and amenities, an existing greenway and a public greenway trail that is being built by a developer. Wake Forest Same as Sponsoring AgencyWake Forest$658,800.00$335,600.00$4,554,200.00
 Smith Creek Greenway phase 2Smith Creek Greenway phase 2 will provide construction of a 2.48 mile, ten-foot wide paved greenway trail that will connect Smith and Sanford Creek Greenway (C-5164) to Smith Creek Greenway at Burlington Mills Road. The project will also provide a major trailhead with parking, restrooms, amenities, wayfinding signage, and three neighborhood connections. Wake Forest Same as Sponsoring AgencyWake Forest$615,144.00$992,662.00$7,314,960.00
U-5530 GAPark - Depot Greenway TrailRight-of-way acquisition and construction of 1,870 linear feet of paved or boardwalk greenway trail from the existing Park-Depot Greenway Trail in the Town’s Old Honeycutt Park to the existing Park-Depot Greenway Trail in South Lakes Subdivision located on the east side of NC Highway 55 South Fuquay-Varina Same as Sponsoring AgencyFuquay-Varina$0.00$0.00$1,085,117.00
 Kelly and Apex Barbecue Pedestrian ProjectsThe Kelly and Apex Barbecue Pedestrian Project will complete a pedestrian route from Olive Chapel Elementary School through Kelly Road Park to Scotts Ridge Elementary School. This project completes the pedestrian gap along the east side of Kelly Road from Beaver Trail to Apex Barbecue Road and along the south side of Apex Barbecue Road from Kelly Road to the Scotts Ridge Elementary School driveway. These pedestrian improvements include: Complete construction of approximately 2,550 linear-feet of 5-foot sidewalk, curb, and gutter along the east side of Kelly Road and approximately 1,850 linear-feet of 10-foot multi-use path, curb and gutter along the south side of Apex Barbecue Road Install accessible ramps along Kelly Road at Beaver Trail (south side), Grand Kelly Way, and Apex Barbecue Road Install accessible ramps along Apex Barbecue Road at Kelly Road and the western driveway for Scotts Ridge Elementary School Install standard two-bar cross walk and push-button pedestrian signal across Apex Barbecue Road at Kelly Road Install standard two-bar cross walk across Kelly Road at Apex Barbecue Road Apex Same as Sponsoring AgencyApex$0.00$110,000.00$815,000.00
 East Fuquay Historic District Sidewalk ProjectThis project consists of Planning/Design/NEPA, Right-of-Way Acquisition and Construction approximately 1,400 linear feet of sidewalk, curb and gutter, and the associated drainage network. Work also includes the demolition of approximately 500 linear feet of substandard sidewalk. Fuquay-Varina Same as Sponsoring AgencyFuquay-Varina$80,000.00$80,000.00$686,000.00
 North Main Street SidewalkWe propose to build 0.38 miles of new sidewalk along North Main Street from Oak Hall Drive to the North Main Athletic Complex (Ting Park). This sidewalk will connect residential neighborhoods south of the sports complex to the North Main Athletic Complex, while also closing the last gap between Holly Springs's Village District and the sports complex. Holly Springs Same as Sponsoring AgencyHolly Springs$101,797.00$6,000.00$335,000.00
 Blue Ridge Road Bike/Ped ImprovementsBuild multi-use path, sidewalks, and separated bike facilities along Blue Ridge Road, including a new bridge over Wade Avenue. Raleigh Same as Sponsoring AgencyRaleigh$500,000.00$810,000.00$3,800,000.00
 I-40 Triangle Bikeway Phase 1Phase one of the Triangle Bikeway will provide approximately 4 miles of paved greenway trail running parallel to I-40 from the Regional Transit Center to Umstead State Park, also providing connections to Lake Crabtree Park, the Black Creek Greenway, the East Coast Greenway, existing bicycle lanes on Slater Road, and several major business parks that serve RDU and the Research Triangle Park. Other/separate phases of the Triangle Bikeway to connect to the North Carolina Museum of Art and the Park Center at RTP. Wake County Same as Sponsoring AgencyCary$1,276,080.00$1,504,800.00$11,256,000.00
 Higgins Greenway Ph 3Right of way acquisition and construction for approximately .8 miles of 10' wide greenway trail, connecting and extending the existing Higgins Greenway to downtown Cary. Cary Same as Sponsoring AgencyCary$70,000.00$1,900,000.00$1,000,000.00