TIP IDProject NameProject Description Sponsoring Agency
Managing AgencyProject LocationDesign PhaseDesign CostROW PhaseROW CostConstruction PhaseConstruction Cost
 Lumley-Westgate-Ebenezer Church Roads Bicycle ­& Pedestrian ProjectConstruct bicycle facilities from Brier Creek to Leesville Road along Lumley and Westgate Roads. Construct bicycle facilities from Westgate Road to Umstead State Park along Ebenezer Church Road. Raleigh Same as Sponsoring AgencyRaleigh$1,000.00$1,000.00$1,000.00
 Beaverdam Creek Greenway Phase IThe proposed greenway is a 10-foot-wide asphalt trail of approx 5,100 linear feet or .966 mile between Spiderlily Court [Taryn Meadows subdivision] and Pippin Road [Weaver's Pond subdivision and greenway, Wakelon School and Park] that will provide a safe bike/ped route for all our citizens and an alternate means of transportation for over 1,997 households located within a half mile radius from the heart of the greenway within Taryn Lake, Taryn Creek, Weavers Pond, Woody Honeycutt, Tony Moore Property, and the Johnny Watson development. The design, easement acquisition, public input, and permitting are complete. The project is shovel-ready. Zebulon Same as Sponsoring AgencyZebulon$0.00$0.00$2,006,495.00
 Bridge Street SidewalkThis project will consist of sidewalk, curb and gutter, storm drainage, and crosswalks. Fuquay-Varina Same as Sponsoring AgencyFuquay-Varina$88,852.50$180,000.00$426,492.00
 Jones Street SidewalkThis project will provide safer pedestrian access along both sides of Jones Street. These proposed improvements will connect the Downtown Fuquay Corridor to the Fuquay-Varina Middle School. Fuquay-Varina Same as Sponsoring AgencyFuquay-Varina$73,500.00$480,000.00$352,800.00
U-5530 GAPark Depot Greenway TrailMinor adjustments to the PS&E package are required because of the updates to NCDOT's Spec. Book. Construction of 1,870 linear feet of paved or boardwalk greenway trail from the existing Park-Depot Greenway Trail in the Town’s Old Honeycutt Park to the existing Park-Depot Greenway Trail in South Lakes Subdivision located on the east side of NC Highway 55 South Fuquay-Varina Same as Sponsoring AgencyFuquay-Varina$50,000.00$0.00$1,085,117.00
 Crabtree Creek Greenway ConnectorConstruction of a 10' wide greenway gap between the recently completed Crabtree Creek Greenway and the Weston Greenway, including a grade-separation under Weston Parkway. Cary Same as Sponsoring AgencyCary$150,000.00$0.00$2,825,000.00
 Laura Duncan Road Pedestrian Improvement ProjectThe Laura Duncan Road Pedestrian Improvement Project alters the roadway design between Apex Community Park and North Salem Street to improve safety of pedestrians crossing Laura Duncan Road. The draft design for the project includes: -Resurfacing and restriping Laura Duncan Road from south of the Apex Community Park driveway to the railroad tracks parallel to North Salem Street. This redesign is intended to better use the space between existing curbs to provide a protected median for pedestrians crossing Laura Duncan Road and a lane for bicyclists traveling along Laura Duncan Road. In addition, a south-bound left-turn lane will be provided to Apex Community Park. This work will improve the crosswalk installed by the Town in August 2018, which is considered an interim solution to the pedestrian needs in this area. -Installing a new high-visibility crossing of Laura Duncan Road at Laurel Park Place with revised curb and gutter alignment, new sidewalk, detectable warning surfaces, concrete median island, and rapid flashing beacons. -Installing a standard two-bar crosswalk across Laurel Park Place at Laura Duncan Road. -The project is within existing right of way. Apex Same as Sponsoring AgencyApex$0.00$0.00$554,000.00
 Crabtree Creek Greenway - Bond to High HouseDesign and construction of .6-mile gap between the Black Creek and White Oak Creek Greenways and Bond Park to Preston Fields park and existing sidewalk and signed bike route along High House Road. This gap includes use of a grade-separation to get under Cary Parkway. Cary Same as Sponsoring AgencyCary$247,500.00$0.00$1,402,500.00
 Beaver Creek Greenway ExtensionThe Beaver Creek Greenway project will complete a missing gap in the greenway corridor between Kelly Road Park and Apex Nature Park and realign an adjacent segment of existing Beaver Creek Greenway that is consistently unusable due to flooding. These bicycle and pedestrian improvements include: -Complete construction of approximately 5,560 linear-feet of 10-foot asphalt, concrete, and boardwalk greenway along the Beaver Creek corridor between the Ashley Downs neighborhood and the Apex Nature Park. This includes realigning the greenway just east of the underpass of NC 540, where it is currently prone to flooding, and providing new grade-separated bicycle and pedestrian crossings at Kelly Road and Apex Barbecue Road. -Install concrete curb ramp and expand off street gravel parking at trailhead in the Greenbrier neighborhood, connecting to the approximate 210 linear feet of 10-foot asphalt connector trail. -Install approximately 525 linear-feet of 10-foot asphalt trail for the Kelly West neighborhood trail connector. -Install Town of Apex standard trash and recycle receptacles and dog waste stations. -Install Town of Apex standard Greenway wayfinding signage. Apex Same as Sponsoring AgencyApex$0.00$0.00$6,565,300.00
 Junny Road Sidewalk ExtensionThe Town of Angier seeks to extend our existing sidewalk network in order to provide walkable connectivity to an under served area of town, as well as provide a connection between our ongoing NC 210 sidewalk extension and the neighboring low income area. This project will consist of design, engineering and construction for two 5' wide sidewalk sections which will include curb & gutter. The new sidewalk will provide a valuable link between several large residential developments on the Northeast side of Town and the Town core which includes the community pool, Jack Marley Park and Downtown Angier. The first section of new sidewalk will extend North along North Willow Street to Junny Road (850 ft.) and then Northeast along Junny Road to its intersection with Glen Meadow Drive (2,000 ft.). The second piece will extend roughly 1,100 feet West along West Lillington Street to its intersection with NC 210 (W. Depot St.). Angier Same as Sponsoring AgencyAngier$175,000.00$150,000.00$1,457,500.00