2013 Roadway Projects

TIP IDProject NameProject Description Sponsoring Agency Managing AgencyProject LocationDesign PhaseDesign CostROW PhaseROW CostConstruction PhaseConstruction Cost
 NC 55 Corridor ImprovementsThe project involves corridor improvements along NC 55 from South Salem Street (SR 1011) to Apex Peakway near South Hughes Street (SR 1158). Improvements include intersection upgrade for NC 55 at South Hughes Street near South Salem Street and lane addition on eastbound NC 55 at Apex Peakway. The intersection improvement will include the addition of turn lanes, new signal poles, mast arms, and pedestrian signalization for one or more approaches. The project includes clearing and grubbing, grading, asphalt paving, curb, gutter, concrete driveway aprons, pedestrian pushbuttons and signal heads, traffic signal poles, and sections of five-foot concrete sidewalk. The project may include some areas where public easements and/or public rights-of-way must be obtained from private property owners. Apex Same as Sponsoring AgencyApex$30,000.00$26,000.00$557,000.00
 Capital Boulevard ImprovementsThis project will complete preliminary engineering and design of street improvements along Capital Boulevard from Spring Forest Road to Old Wake Forest Road (1.1 miles). The design will include preliminary engineering for the widening of Capital Blvd from 6-lanes to 8-lanes, installation of curb and gutter and associated drainage systems, sidewalks on both sides of the street, landscaping, streetlights, and bus stop amenities. Upon the completion of the preliminary engineering and design, the project will be programmed for construction and will also complete the City’s sidewalk network along Capital Boulevard. Raleigh Same as Sponsoring AgencyRaleigh$560,000.00  
 Kipling RoadRelocate approx. 0.6 miles of Kipling Rd., moving the intersection of Kipling Rd (SR 1403) and US 401 approx. 325 ft northward. Division 6 Same as Sponsoring AgencyHarnett County$100,000.00$50,000.00$750,000.00
 Bridge 151 HarnettReplace Bridge 151 crossing Hector's Creek located on SR 1415 in Harnett Co. Division 6 Same as Sponsoring AgencyHarnett County$100,000.00$20,000.00$1,100,000.00
 Bridge 233 HarnettReplace Bridge 233 crossing Black River Tributary on SR 1544 in Harnett Co. Division 6 Same as Sponsoring AgencyHarnett County$100,000.00$20,000.00$625,000.00
U-5315NC 540/Morrisville Parkway InterchangeFinal design of an interchange (diamond or partial cloverleaf) with NC 540 at future Morrinsville Parkway in west Cary Cary Same as Sponsoring AgencyCary$750,000.00  
 Stadium Drive - Complete StreetThis project will complete preliminary engineering and design to implement a Complete Streets vision along Stadium Drive (SR1930) from Capital Blvd (US-1) to N. Wingate St. (SR 1954). The typical section includes three lanes with curb and gutter, left-turn lanes at intersections and driveways, a 10-ft wide multi-use path on the south side, 5-ft wide sidewalks on the north side, wide striped shoulders on each side of the roadway, a pedestrian refuge island, high visibility crosswalks and ramps, and accessible transit stops. Wake Forest Same as Sponsoring AgencyWake Forest$292,937.50  
 US 70 CorridorThe project consists of road improvements on the I-40 Eastbound Ramp at westbound US 70, an additional through lane and turn lanes on US 70, an additional lane on southbound White Oak Road and additional through lanes and turn lanes on Jones Sausage Road. Garner Same as Sponsoring AgencyGarner  $5,200,000.00
 Main St ExtensionThis project involves the realignment of Piney Grove Wilbon Rd to Ralph Stephens Rd. The project includes survey, preliminary design, permitting, and right of way. This project will include grading, asphalt widening, curb and gutter, associated drainage, sidewalk, bike lanes, and street lighting. Holly Springs Same as Sponsoring AgencyHolly Springs$430,000.00$1,000,000.00 
 Avent Ferry Rd ImprovementsThis project involves improvements along Avent Ferry Road from NC 55 Bypass to Cass Holt Rd. Improvements include upgrading 4950 ft of congested road to a 4 lane median divided facility. This project includes survey and preliminary design, right of way and construction to be applied for in LAPP 2014. Design will include grading, asphalt widening, permitting, curb and gutter, associated storm drainage, bike lane, and street lighting. Holly Springs Same as Sponsoring AgencyHolly Springs$180,000.00