TIP ID | Project Name | Project Description |
Sponsoring Agency
| Managing Agency | Project Location | Design Phase | Design Cost | ROW Phase | ROW Cost | Construction Phase | Construction Cost |
| Harris Road Operational Improvements | Construction for a single-lane roundabout and pedestrian facilities at the intersection of Harris Road (SR 1931) and W. Oak Avenue (SR 1931)/Wall Road (SR 1932). The proposed improvements include installing a roundabout with associated curb & gutter, stormwater, realigning a portion of Harris and Walls Roads, adding approximately 2,700 lf of sidewalk on Wall Road to Wallridge Drive (Wallridge Subdivision) and 350 lf of sidewalk from Wall Road to existing sidewalk at Harris Point Way (Harris Point Subdivision). Required Right-of-Way is minimal; less than 10 parcels are impacted by this improvement project. |
Wake Forest
| Same as Sponsoring Agency | Wake Forest | | $0.00 | | $0.00 | | $1,987,756.00 |
| Old Honeycutt/Purfoy Road Intersection Improvements | This Project consists of improving the intersection by potentially adding turning lanes, modifying signal timing, adding phases to the signals, and adding pedestrian crossings and signals. |
Fuquay-Varina
| Same as Sponsoring Agency | Fuquay-Varina | | $136,500.00 | | $120,000.00 | | $962,000.00 |
U-5501 | Reedy Creek Road Improvements Phase 2 | This construction project is the 2nd phase of the Reedy Creek Road widening project extending from N Harrison Ave to NE Maynard Rd. Phase 1 is funded in FY18 and consists of ROW acquisition throughout the corridor and construction of Segment A, N Harrison Ave to 600 ft south of Watts Pond Lane. Phase 2 will construct Segment B from 600 ft south of Watts Pond Lane to NE Maynard Rd. The construction project widens Reedy Creek Road from a 2-lanes to a 3-lane cross-section with curb and gutter, center turn lane, 2 roundabouts, bike lanes, and sidewalks along both sides of the corridor. |
Cary
| Same as Sponsoring Agency | Cary | | $0.00 | | $0.00 | | $6,720,000.00 |
| Rock Quarry Road - Part A | This project would widen Rock Quarry Road to a four-lane median-divided section from Olde Birch Drive to Sunnybrook Road. The project scope will include curb & gutter, a sidewalk on the north side, a shared use path on the south, streetlights, and landscaping. This project will complete the last gap in the widening of Rock Quarry Road between Jones Sausage Road and central Raleigh. This project will be included in the NCDOT Design/Build contract for I-5111 (I-40 Widening). |
Raleigh
| Division 5 | Raleigh | | $1,230,000.00 | | $1,891,000.00 | | $11,062,000.00 |
| New Bern Avenue Bottleneck Elimination | Construct approximately 500 feet of a third lane on New Bern Avenue to provide a consistent three lanes eastbound. Project will include curb and gutter and sidewalk from start to end point. |
Raleigh
| Same as Sponsoring Agency | Raleigh | | $50,000.00 | | $112,000.00 | | $400,000.00 |
| Holly Springs Rd. Widening | This project will widen approximately 1 mile of Holly Springs Road to match previously widened sections of roadway. Widening will occur on both the north and south sides of the roadway. The project will provide missing links of sidewalk as well. |
Holly Springs
| Same as Sponsoring Agency | Holly Springs | | $0.00 | | $997,115.00 | | $1,521,005.00 |
| Connected Vehicle Technology | The Town plans to expand a joint NCDOT-Cary Signal Phasing and Timing (SPaT) project by adding Connected Vehicle (CV) technology town-wide with additional Vehicle to Infrastructure (V2I) safety measures. This ITS project would upgrade existing traffic signal controllers, install Road Side Radio Units (RSUs), and implement a CV software suite to allow Town staff to communicate with drivers about roadway and operational conditions; allow vehicles to share data with Town staff such as speed, volume, and delay; and improve efficiencies through the retrieval of high definition data.
Funding would provide for new equipment and software to operate approximately 100 traffic signals in the Town’s ATMS. The RSUs will be placed along major thoroughfares, including US and NC routes, as well as strategic corridors within the Town. The $400,000 of matching funds associated with this grant request is programmed within FY 2019 of the Town’s capital improvement plan. |
Cary
| Same as Sponsoring Agency | Cary | | $0.00 | | $0.00 | | $2,000,000.00 |
| Airport Blvd Extension | Extend Airport Blvd from Garden Square Lane to Church Street. |
Division 5
| Same as Sponsoring Agency | Morrisville | | $500,000.00 | | $600,000.00 | | $3,500,000.00 |