TIP ID | Project Name | Project Description |
Sponsoring Agency
| Managing Agency | Project Location | Design Phase | Design Cost | ROW Phase | ROW Cost | Construction Phase | Construction Cost |
| White Oak, Hebron Church, Ackerman - Intersection Improvements | The project, located within the jurisdiction of the Town of Garner, NC, consists of improving the intersections of White Oak at Hebron Church Road and Hebron Church at Ackerman Road into a single, multi-lane roundabout intersection. |
Garner
| Same as Sponsoring Agency | Garner | | $0.00 | | $75,000.00 | | $2,080,616.00 |
| Sunset Lake Road Widening Phase II | This project is the 2nd phase of the proposed widening of Sunset Lake Road and will provide additional travel lanes across the Norfolk Southern Railroad. |
Fuquay-Varina
| Same as Sponsoring Agency | Fuquay-Varina | | $153,360.00 | | $3,060,000.00 | | $0.00 |
| Judd & South Main Intersection Operational Improvements | This project will improve the intersection at Judd and South Main. Dedicated left and right turn lanes will be added. |
Fuquay-Varina
| Same as Sponsoring Agency | Fuquay-Varina | | $86,793.75 | | $62,500.00 | | $468,970.00 |
| Highway 55 and NE Judd Parkway Intersection Operational Improvements | This project will add dedicated left, through, and right turn lanes on the eastern side of the intersection. |
Fuquay-Varina
| Same as Sponsoring Agency | Fuquay-Varina | | $252,876.25 | | $125,000.00 | | $1,517,257.50 |
| Carpenter Fire Station Rd (SR 1624) Widening | The Town proposes to widen approximately 1 mile of Carpenter Fire Station Road (SR 1624) from NC 55 to Cameron Pond Dr to a 4-lane median divided roadway with curb and gutter, street-side trail on the south side and sidewalk on the north. Cyclists can choose to either ride in the wide outside lane or along the trail/sidewalk. Median breaks will be placed at critical intersections. |
Cary
| Same as Sponsoring Agency | Cary | | $1,100,000.00 | | $5,630,000.00 | | $6,100,000.00 |
| NC 42 turn lanes | Add left turn lanes on NC 42 at Saul's Road, Field Hill, Oviedo, St. Jen's, and Winterton. Due to proximity of Field, Oviedo, St. Jen's, and Winterton, turn lanes in that section will be constructed as TWLTL. |
Division 5
| Same as Sponsoring Agency | Wake County | | $387,500.00 | | $355,000.00 | | $2,927,000.00 |
| Chapel Hill Road Widening | The Town proposes to widen approximately 2 miles of Chapel Hill Road from NW Maynard Rd to NE Maynard Rd to a 4-lane median divided roadway with wide outside lanes for bicycle traffic, curb and gutter, sidewalk and street-side trail. Median breaks will be placed at critical intersections. |
Cary
| Same as Sponsoring Agency | Cary | | $2,000,000.00 | | $6,110,000.00 | | $16,735,000.00 |
| NC 98 @ Camp Kanata | Add an EB left turn lane on NC 98 and signalize. |
Division 5
| Same as Sponsoring Agency | Wake County | | $150,000.00 | | $22,000.00 | | $1,050,000.00 |
| 42 E Extension | Extension of NC 42 E (+/- 2,000 linear feet) from US HWY 70 BUS W to Ranch Road (Little Creek Church Road). |
Clayton
| Division 4 | Clayton | | $1,425,000.00 | | $2,168,750.00 | | $6,250,000.00 |