Locally Administered Projects Program N.C. Capital Area MPO Homepage

N.C. Capital Area MPO

2012 Roadway Projects

TIP IDProject NameProject Description Sponsoring Agency Managing AgencyProject LocationDesign PhaseDesign CostROW PhaseROW CostConstruction PhaseConstruction Cost
 Lake Wheeler Road ImprovementsThis project involves the construction of sidewalk and multi-use path on the west side of Lake Wheeler Road from Centennial Parkway to Tryon Road (1.6 miles) and will include the installation of turning lanes at Carolina Pines Avenue and Linberry Drive. The project also includes the installation of concrete pedestrian refuges at the I-40 ramp locations and some driveway modifications to aid with pedestrian safety. Sidewalk will be constructed from Centennial Parkway to Lawrence Drive and a multi-use path will be constructed from Lawrence Drive to the Raleigh Oaks Shopping Center Driveway. Raleigh Same as Sponsoring AgencyRaleigh  $2,150,000.00
 SS 05-10-4820Install Traffic Signal - NC 98 at SR 1917 (Stoney Hill Rd) Division 5 Same as Sponsoring AgencyWake County$4,000.00 $51,000.00
 Carpenter Fire Station Road Grade Separation NEPA and Design (east of NC 55)The project involves the environmental study and preliminary engineering for new roadway alignment and grade-separated railroad crossing on Carpernter-Fire Station Road from Morrisville-Carpenter Road to NC 55 (0.4 miles) Cary Same as Sponsoring AgencyCary$900,000.00  
 SS 05-02-217Install Traffic Signal - SR 1002 (Aviation Pky) at International Dr Division 5 Same as Sponsoring AgencyMorrisville$4,000.00 $51,000.00
 SS 05-99-223Install Guardrail - Bridge 20 on NC 97 at the Wake/Franklin Co Line Division 5 Same as Sponsoring AgencyWake County$500.00 $25,000.00
 Downtown Cary RoundaboutsThis project involves environmental documentation and construction of three roundabouts in the Downtown Cary as part of the Downtown Streetscape project. The locations are Walnut St. at Kildaire Farm Rd., W Chatham Rd. at Old Apex Rd., and E Chatham Rd. at E Durham Rd. Cary Same as Sponsoring AgencyCary  $1,000,000.00
 Green Level West Rd. Widening NEPA and DesignThis project involves the environmental study and design for widening Green Level West Road from west of NC 55 to Green Level Church Road from 2 to 4 lanes (2.0 miles). Cary Same as Sponsoring AgencyCary$1,000,000.00  
 Reedy Creek Road Widening/Safety NEPA and DesignThe project involves environmental study and design for widening the roadway to three lanes from NE Maynard Rd. to N. Harrison Ave. (1.2 miles). The project will include safety and pedestrian improvements. Cary Same as Sponsoring AgencyCary$200,000.00  
U-3605Front Street Extension from Mills Street to Pecan Lane in Clayton, NC (U-3605)Prepare the design for a new location Front Street Connector in Clayton, NC. This facility will be an approximately 0.9 mile two-lane minor thoroughfare connection from Mills Street to NC 42. The exact intersection configuration of Front Street and Mills Street and Front Street and NC 42 will be based on a traffic engineering study. The facility will be a 32-foot (fact-to-face) curb and gutter roadway with a 5-foot sidewalk on one side and 10-foot multiuse asphalt path on the other side. This request also includes funding to complete the appropriate NEPA analysis, and obtain appropriate NEPA approval. Clayton Same as Sponsoring AgencyClayton$80,000.00$40,000.00$1,500,000.00
 South/Lenoir Street Two-Way ConversionThis project involves the conversion of Lenoir Street and South Street from one-way operation to two-way operating streets. The street segments that will be converted to two-way are from South Saunders Street to Dawson Street (.38 mile) on South Street and from Wilmington Street to East Street (.34 mile) along both Lenoir and South Streets. The project will include modification of traffic signals, turn lane improvements, installation of new pedestrian head signals, crosswalks, and raised landscaped medians. The project will also add striped bicycle lanes along South Street from South Saunders Street to East Street (0.9 mile) and sharrows along Lenoir from Dawson Street to East Street (0.64 mile). This project incorporates Complete Street principles and will enhance traffic operations and mobility for motorists, pedestrians, and cyclists. Raleigh Same as Sponsoring AgencyRaleigh  $1,700,000.00